ERM Protection Research Coordinator
Kabul
- Organization: IRC - International Rescue Committee
- Location: Kabul
- Grade: Mid level - Mid level
-
Occupational Groups:
- Scientist and Researcher
- Managerial positions
- Protection and rule of law
- Closing Date: Closed
Requisition ID: req7202
Job Title: ERM Protection Research Coordinator
Sector: Protection and rule of law
Employment Category: Fixed Term
Employment Type: Part-Time
Open to Expatriates: Yes
Location: Kabul, Afghanistan
Job Description
Activity Approach Review of existing Cash Transfer research Desk Review of Secondary Sources: Desk based-review to examine current literaturerelated to community preference for cash modalities, community perceptions of risks related to cash programming , community perceptions of impact of cash on meeting immediate and longer term humanitarian and protection needs Information Gathering with communities: Conduct community level KII and FGDs[1], disaggregated by gender and age, to fill knowledge gaps, gather additional community input on how to modify existing cash program to support shock-responsive community based protection approaches[2]. Support at the field level to be provided by the Protection Rule of Law and Child Protection Managers, with technical oversight from the Integrated Protection Coordinator. Summary Report:Consultant to develop summary report including key findings from desk based research, limited case studies, initial protection-focused cash program design framework Revision of existing Protection tools[3] to reflect community input to create inter-agency package of tools available to all protection actors. Collaborative workshop with communities: Based on report findings (see above), review existing tools and highlight where modifications can be made in line with community preference and implementation feasibility. Prioritized consideration to be given to meeting emergency triage for protection needs, community engagement, and building community ownership and sustainability Revised Protection/Cash tools: Utilize workshop findings to finalize a modified package of protection and cash tools for piloting Pilot implementation of agreed tools and stress test assumptions of community co-designed model[4] Implement Protection/Cash tools: Pilot enhanced cash/protection approach in two provinces determined at focus group discussion stage, gaining community permission to longitudinally monitor protection outcomes—at individual and community level. Pilot and data collection to target beneficiaries receiving basic-cash package and basic-cash package plus additional protection support[5] Develop series of implementation briefs: Check-in with communities according to research schedule to review impact of cash/protection intervention and develop research briefs on preliminary findings. Joint community-IRC evaluation on pilot outcomes Validation workshop: Conduct validation workshop to review and validate findings of operational research with community members via lessons learned workshop. Event organized with community Develop final report Final report and summary package of tools: Final report based on summary of findings from validation workshops to be written by consultant. Report should include package of revised tools, revised cash for protection program approach, short case studies, recommendations for way forward [1] FGDs and KIIs will be held with those who receive cash assistance (either through ERM or other humanitarian programs) [2] Approaches should be scalable to include 1. How current cash programming can support better protection outcomes 2. How additional protection-specific cash envelops can enhance community-based protection systems (formal and informal) [3] Including APC, ERM Protection, Safer Cash tools. Intention is not wholesale revision, but streamlining of tools in line with community feedback and preference [4] This may be Individual Protection Assistance (IPA), community based protection committee quick action funds, in-kind assistance or a combination based on feedback from the community in discussions and co-design stage. [5] To be discussed: This can be tied to existing IPA budget and/or drawn from research budget
Qualifications
#LI-GR2
However, we have found similar vacancies for you: